1. Cut the pipe perpendicularly to its axis using an appropriate pipe-cutting too. Avoid using a hacksaw or a blade for cutting.
2. Calibrate the pipe using a special reamer, removing possible residual burr. (essential for sizes above 026mm)
3. Insert the pipe into the pipe holder until the pipe stops atthe plastic ring. Check that the pipe is properly inserted and visible from all inspection windows.
4. Place the pressing jaws of appropriate size on the sleeves and perform pressingoperation. An improper placing of the jaws could damage the system.